Next-day shipping on select in-stock kits Custom sizes & colors built to order
Call 1-888-779-2284
Aging Safely Walk in Tubs BBB Business Review

BBB Accredited BusinessAging Safely Baths, the company behind this site

In short

To measure for a shower kit, record the opening width at the floor, middle and top, the depth at both ends, both diagonals, the drain center from the back and side walls, the valve height and side, the ceiling height, and the narrowest door or stair turn the boxes must pass. Use the smallest width and depth.

Measuring guide · 9 min read

How to measure for a shower kit, including the numbers most people forget

A shower kit is a factory-made object going into a hand-built room. The room is never quite as square, level or wide as it looks. Twenty minutes with a tape and a level tells you which kit will actually go in, and which one will turn into a callback.

Finished walk-in shower with a low entry and glass panel
3 widthsFloor, mid-height and top. Order to the smallest.
2 diagonalsEqual means square. A gap tells you about shimming.
1 delivery pathThe tightest turn decides one-piece or multi-piece.

What you need before you start

A 25-foot tape measure, a 4-foot level, a pencil, your phone camera and a sheet of paper. A framing square helps but is not essential. Measure in inches and write fractions to the nearest eighth. Rounding every number to the nearest inch is the most common reason a kit that “should fit” does not.

Measure twice, on two different days if you can, or have a second person read the tape. Write each number on a quick sketch of the room viewed from above, with the door, the window, the toilet and the plumbing wall marked. That sketch is worth more to a supplier than any single measurement.

Step 1: decide which opening you are measuring

There are two openings in every shower space and they differ by the thickness of the wall finish. The finished opening is wall surface to wall surface, the space you see today. The rough opening is stud to stud, what you will have once the old tile, backer board or surround is stripped out. Depending on the design, a kit is sized to one or the other. Flanged bases and panels that fasten to framing usually work from the rough opening; some remodel systems are made to sit inside the existing finished walls.

If the walls are still covered, measure the finished opening now and estimate the rough opening by checking the wall thickness at an outlet box, the edge of a door casing or an access panel. Tell your supplier which number is which. A half-inch of drywall plus a half-inch of tile on each side is a full two inches across the opening.

Step 2: measure the width three times

Measure the width from the back corner area outward at three heights: just above the floor, at roughly waist height, and as high as you can reach. Walls bow, and old walls bow more. The smallest of the three is your working width. If the difference between the largest and smallest reading is more than about a quarter inch, note it, because the installer will need to shim or plane something to get panels to sit flat.

Step 3: measure the depth at both ends

Depth runs from the back wall to the front edge of the opening. Measure at the left wall, the right wall and the center. For a tub alcove, measure to the front face of where the tub apron sits now, not to the edge of the bathroom floor tile. Again, work from the smallest number.

Step 4: check that the corners are square

Measure diagonally from the back-left corner to the front-right corner, then from back-right to front-left. If the two diagonals match within about an eighth of an inch, the opening is square. If they differ, the room is a parallelogram and a rectangular base will leave a tapering gap along one wall. That is normally solved with shims and framing adjustments rather than a custom base, but the installer needs to know before the day, not on it.

Step 5: check the floor and walls for level and plumb

Lay the level on the floor in both directions where the base will sit, and hold it upright against each wall. Note which way the floor falls and roughly how much. A base designed to arrive pre-leveled still needs a flat, solid surface underneath it; a floor that dips or flexes has to be corrected first, and that work belongs in your budget.

Step 6: locate the drain

This is the measurement that moves the price most. Measure from the back wall to the center of the drain, then from the nearer side wall to the center. Note the pipe size if you can see it, and whether the floor is a concrete slab or wood framing with a crawlspace or basement below. A base whose drain lines up with your existing waste line can be connected without opening the floor. A base whose drain does not line up means cutting into the subfloor, or into a slab, to move the pipe.

In a tub alcove, the drain sits at one end. Stand facing the tub: if the drain is on your left, it is a left-hand drain. Kits are offered with end drains on either side or center drains, so record which you have.

Step 7: locate the valve and shower head

Measure the height of the valve center above the floor and its distance from the nearest side wall, plus the height of the shower-head arm. If you plan to keep the valve where it is, the wall panels must be cut around it. If you plan to move it lower for someone who sits to shower, that is plumbing work behind the wall, and it is the moment to do it.

Step 8: measure the ceiling and anything overhead

Measure floor to ceiling inside the opening and note soffits, sloped ceilings, light fixtures and windows. Wall panels come in set heights; a low or sloped ceiling can rule some systems out or call for trimming. A window inside a shower wall needs a plan for how the panel will be cut and sealed around it.

Step 9: measure the way in

This is the step almost everyone skips. Measure the narrowest point between the delivery truck and the bathroom: the front door, any interior door, the tightest hallway turn and any stair landing. Measure door openings with the door open, from the face of the door to the opposite jamb. A one-piece unit has to pass through all of them whole. Multi-piece kits exist precisely because most finished homes cannot take a one-piece shower through the front door. If you are unsure, send photos of the route.

Step 10: check the space in front of the shower

The 2024 International Residential Code asks for a shower access opening of at least 22 inches of clear finished width, and a compartment with at least 900 square inches of interior area and no dimension under 30 inches, with limited exceptions (IRC P2708.1). Your city or county may have adopted a different edition or a different plumbing code, so treat those as a floor, not a target. If a walker, wheelchair or helper will be in the room, measure the open floor in front of the opening as well, and read our guide to curbed and curbless kits.

The measuring worksheet

MeasurementHowWrite down
WidthFloor, waist height, top of reachAll three, plus finished or rough
DepthLeft, center, rightAll three
DiagonalsCorner to opposite corner, both waysBoth numbers
FloorLevel in both directionsWhich way it falls, roughly how far
DrainBack wall to center, side wall to centerBoth, plus left, right or center; slab or joists
ValveFloor to center, side wall to centerBoth, plus keep or move
CeilingFloor to ceiling inside the openingHeight, soffits, windows
Way inNarrowest door, hall turn, stair landingWidth and any tight turns

Common openings and the kits that go in them

One of the most common openings for a kit is a standard bathtub alcove, usually about 60 inches long. That is why our most common footprints are 60 inches wide, in several depths, and why our shower sizes page lists every stock footprint from 30×30 up to 78×48. Corner stalls, neo-angle stalls and walk-in closets converted to showers are the next most common, and those are the openings most likely to end up as a custom size.

Photos to send with your numbers

  • The whole shower or tub area, straight on, from the bathroom door.
  • The drain, from directly above, with the tape measure laid from the back wall.
  • The valve and shower head wall.
  • The floor in front of the shower, and the bathroom door.
  • Any tight turn or stair on the way in.

With those and the worksheet, we can tell you which footprint fits, what threshold makes sense, and whether anything about the room needs fixing before the kit goes in. Most of the mistakes on our buying-mistakes list are measuring mistakes.

Sources

Checked October 2026. Codes and published prices change; follow the links for current figures.

Questions

What people ask us about this.

Something else? Call 1-888-779-2284.

Should I measure the opening with the old walls on or off?

Measure what you have now and say so. If the old tile or surround is still on, also estimate the stud-to-stud opening by checking the wall thickness at an outlet or door casing. Tell the supplier which number is finished and which is rough, because kits are sized to one or the other.

What if my three width measurements are different?

Order to the smallest one. A difference of more than about a quarter inch usually means the wall bows or leans, and the installer will shim or adjust framing so the panels sit flat. Write all three down so that work is planned rather than discovered.

How do I know if my drain will line up with a new base?

Measure from the back wall to the center of the drain and from the nearer side wall to the center, and note whether it is at the left end, right end or center. Compare those numbers to the drain position on the base you are considering. If they match, the plumber connects without opening the floor.

Can a one-piece shower get into my bathroom?

Only if it fits through every door, hallway turn and stair landing on the way. Measure the narrowest point and send photos. Most finished homes need a multi-piece kit, which is why multi-piece designs exist for remodels.

Get your quote

Send the worksheet. We will check the fit.

Photograph the numbers or type them into the form. We will match them to a footprint, flag anything that needs fixing first and come back with a delivered price.

Rather just talk?

1-888-779-2284

A real person answers, and they know the product. No call center, no script.

Aging Safely Walk in Tubs BBB Business Review
Look us up before you send anything.

Best Shower Kit is run by Aging Safely Baths, a BBB Accredited Business fitting accessible bathrooms since 2012. Click the seal to read the profile. Quotes are free, in writing, and nobody will chase you for an answer.

We use your details to answer your inquiry and nothing else. No lists, no resale, no follow-up you did not ask for.

Call now Get a quote