In short

A multi-piece walk-in shower kit is a two-day job for an experienced installer and a weekend for a careful DIYer. Our pans arrive pre-leveled, so no mortar bed is needed. The eight stages are demo, inspect, rough-in, set the pan, hang the walls, fit the valve and fixtures, seal, then cure. The three things that cause almost every failure are an out-of-level pan, a drain that does not line up, and latex caulk used where 100% silicone belongs. Call 1-888-779-2284 before you demo anything.

Installation guide

How a walk-in shower kit actually goes in

The whole method, honestly: what the eight stages are, what each one costs in hours, which parts a competent DIYer can do, and the exact points where people get it wrong. We would rather you succeed than buy blind.

Call before you demo. Two minutes on the phone about your floor and drain saves more money than anything else on this page.

Pre-leveled pans · no mortar bed Multi-piece fits a 32″ door Made in the USA 30-year limited warranty

The short answer

A straight swap — same footprint, same drain location, no structural change — is a two-day job for a professional and a long weekend for a competent DIYer. Day one is demolition, inspection and rough-in. Day two is setting the pan, hanging the walls, fitting the valve and trim, and sealing.

Our pans arrive pre-leveled and self-sustaining. That means no mortar bed under the pan, which removes a full stage of work and the most common cause of a shower failing five years later. It also means the floor underneath has to be flat, because there is no mud to make up the difference.

The part most guides skip: almost every failed install traces back to one of three things. The pan was not level in both directions. The drain did not line up and got forced. Or somebody used latex or acrylic caulk where 100% silicone belongs, and it let go within two years.

You can do the demo, the pan set, the wall panels and the sealing yourself. Moving a drain line, altering framing or recessing a pan into the floor is where most people should stop and hire a licensed plumber.

Honest assessment

Should you install this yourself?

Five questions. It does not try to talk you into hiring somebody, and it does not try to talk you into doing it yourself. It weighs the five factors that actually predict whether a kit install goes smoothly, and tells you what it finds.

1. Is the drain staying exactly where it is?
2. What is under the bathroom floor?
3. What threshold height are you fitting?
4. What is coming out?
5. Have you soldered, sweated or press-fit a supply line before?

Answer all five and the assessment appears here.

This is a guide, not an inspection. It weighs drain relocation, floor construction, threshold height, demolition difficulty and plumbing experience — the five things that most often turn a straightforward kit install into an expensive one. Nothing you enter is sent anywhere; it runs entirely in your browser.

Before you start

Four things to establish before anything comes off the wall.

Every expensive surprise on a shower install is something that could have been discovered in twenty minutes with a tape measure and a torch. Do these four and the rest of the job is largely predictable.

  1. First

    Measure the opening three times, at three heights

    Measure the width at the floor, at waist height and at the ceiling, then take the smallest number. Walls are rarely parallel, especially in older houses, and a kit sized to the widest measurement will not go in. Do the same for depth. Give us the smallest figure in each direction, not the one you like best.

  2. Second

    Measure the delivery route, not just the bathroom

    Find the narrowest point between the front door and the bathroom — usually a stair turn, a hall doorway or a banister. Multi-piece kits break down to pass a standard 32″ door and turn corners; a split backwall clears openings a full sheet will not. Single-piece units need a clear straight path, which is why they generally suit new construction and gut renovations.

  3. Third

    Find the drain and work out what it is

    Note whether it sits centre, left or right, and how far it is from each wall. Tub drains sit at one end rather than the centre, which is the single most common surprise in a tub-to-shower conversion. Look underneath if you can: cast iron, ABS and PVC all connect differently, and a plumber will want to know before quoting.

  4. Fourth

    Establish what the floor is made of

    Timber joists with a crawlspace or basement below is the easy case. Timber with a finished ceiling underneath is workable but messier. A concrete slab is the hard case, because anything requiring recessing means cutting concrete. Check the floor for level and for flex while you are down there.

The one call that saves the most money

Ring 1-888-779-2284 with those four answers before you order and before you demo. Smallest width, narrowest doorway on the route, drain position, floor construction. That is enough for us to tell you which sizes fit, which threshold height makes sense, whether the drain has to move, and what the freight looks like to your ZIP code.

If the answer is that a different product suits you better, we will say so. We would rather lose an order than have a kit arrive that cannot go in.

Plumbing code

Two model codes. Two different minimum shower sizes.

This catches people out constantly, because most of the internet quotes one number as if it were universal. It is not. Which model code your jurisdiction adopted decides whether a given footprint is legal where you live.

Minimum shower compartment size under the two model plumbing codes
RequirementIPC / IRCUPC
Minimum interior area 900 square inches 1,024 square inches
Minimum dimension 30″ least dimension Must encompass a 30″ circle
Small-footprint exception Down to 25″ least dimension if the compartment has at least 1,300 square inches No equivalent exception
Measured how At the finished interior surface, at a height equal to the top of the threshold, tangent to its centreline — and the area has to be maintained up to 70″ above the drain outlet. Valves, shower heads, soap dishes and grab bars are excluded from the measurement.
Fold-down seats Permitted, provided the minimum area is maintained with the seat folded up Permitted to protrude into the 30″ circle in accessible stalls

Sources: 2024 International Plumbing Code §421.4 and IRC §P2708.1; Uniform Plumbing Code §408.6. Local amendments are common — confirm with your building department.

Why this matters for your order

Kit sizes are quoted as nominal outside dimensions. The code measures the finished interior. Those are not the same number, and the gap is what decides whether a shallow footprint passes. If you are anywhere near the minimum — a 60×29 or 54×30 in particular — ask us for the clear interior dimension of that exact model before you order, and check it against your local code.

Two more numbers to know

A shower drain is 2″ minimum. And an accessible shower spray unit has to deliver water at 120°F maximum under the ADA, which in practice means a thermostatic or pressure-balancing valve rather than a plain mixer. Both are cheap to get right at rough-in and expensive to retrofit.

Rough-in

The dimensions your plumber will ask for.

Rough-in is the stage where mistakes become permanent. These are the working numbers for a typical kit install — always check them against the spec sheet for your exact model, which we will send you.

Typical rough-in elevation

Heights measured from the finished shower floor, not the subfloor.

FINISHED SHOWER FLOOR 78″ shower arm 33–36″ grab bar band 38–48″ mixing valve 17–19″ fold-down seat 2″ DRAIN WALL PANEL

Working figures for a standard kit. The 33″–36″ band is the ADA grab bar height range under §609; our wall panels carry reinforced backing throughout, so on our kits you are not limited to that band. The 17″–19″ seat height and the 38″–48″ valve position are the ADA transfer-shower figures. Always defer to the spec sheet for your model.

Blocking

If you are fitting anything other than our reinforced-backing panels, add solid blocking between studs anywhere a grab bar or seat will land. Retrofitting blocking after the walls are up means opening them again.

Wall flatness

Panels telegraph what is behind them. Check the studs with a long straightedge and shim or plane anything proud before the panels go on, or you will see it in the finished surface.

Subfloor

Because the pan is pre-leveled and self-sustaining, the subfloor under it must be flat, sound and dry. Sister any springy joists and replace any water-damaged decking now, not later.

Kit list

What you need on the bench.

Nothing exotic. The two items people forget are a genuinely long level and the right sealant, and both of those are the ones that matter most.

Tools

  • A 4′ level. Not a torpedo level, not a phone app. This is the single most important tool in the job.
  • Tape measure, chalk line, framing square
  • Stud finder and a pencil
  • Drill/driver with a hole saw set for the valve and shower arm
  • Jigsaw or oscillating multi-tool for panel cut-outs
  • Caulk gun — a decent dripless one
  • Pry bar, reciprocating saw, utility knife for demo
  • Shop vacuum, dust sheets, eye and ear protection, gloves

Materials

  • 100% silicone sealant. Not latex, not siliconised acrylic, not "tub and tile" unless the tube says 100% silicone. Colour-matched to the pan.
  • The adhesive specified for your panel system. Use what the instructions call for — the wrong adhesive can attack the panel.
  • Corrosion-resistant screws for the pan and panel flanges
  • Shims — composite, not timber
  • The drain assembly supplied with the pan. Our no-caulk drain is included.
  • Plumber's putty or the gasket kit per the drain instructions
  • Backer board or moisture-resistant board if you are replacing damaged substrate
  • Blocking timber if your walls are not pre-reinforced

The sealant rule, stated once and plainly

Use 100% silicone everywhere water can reach. Latex and siliconised acrylic caulks are easier to tool and easier to paint, and they are also the reason a large share of showers start leaking at the pan-to-wall joint within two years. They shrink, they lose adhesion on gelcoat, and they support mould. There is no cost saving worth this. Check the tube.

The method

Eight stages, in order.

This is a real sequence, so the numbering carries information: each stage depends on the one before it being finished properly. The most common way an install goes wrong is somebody running two stages in parallel to save an afternoon.

  1. Stage 1 · 2–5 hours

    Shut off, protect, demolish

    Water off at the fixture stops or the main. Protect the route out with dust sheets and cardboard, and put a fan in a window. Take out the old unit in the reverse order it went in: trim, then walls, then the tub or base. A cast iron tub is heavy enough to be dangerous on stairs — the usual approach is to break it up in place with a sledge under a moving blanket, wearing eye protection. Cut fasteners rather than tearing at flanges; you want the studs intact.

  2. Stage 2 · 1 hour

    Inspect what you have uncovered

    This is the stage everybody skips, and it is the one that decides whether the job stays on budget. Look for rot in the sill plate and bottom of the studs, mould behind the old surround, soft subfloor near the drain, and any framing that is out of plumb. Fix all of it now. Every hour spent here is worth three later. If you find something structural, stop and get a professional opinion before you go further.

  3. Stage 3 · 2–6 hours

    Rough-in the plumbing

    Set the mixing valve at the height you want it, allowing for the finished wall thickness. Set the shower arm. Confirm the drain is a 2″ line, properly trapped and vented, and that it lands where the new pan expects it. Dry-fit the pan first and mark the drain position on the subfloor — do not trust the drawing. If the drain has to move more than an inch or two, this is licensed plumber territory in most jurisdictions.

  4. Stage 4 · 2–4 hours

    Set the pan

    Because our pans are pre-leveled and self-sustaining, there is no mortar bed. Set the pan dry, connect the drain per its instructions, then level it in both directions and shim as needed. Check level along the front edge, along the back edge, and across both diagonals. Then check it again with somebody standing in it. Fasten through the flange into the studs with corrosion-resistant screws — snug, not crushed. Fill the pan with a couple of inches of water and leave it while you have lunch: if the level has moved or the drain weeps, you find out now rather than after the walls are on.

  5. Stage 5 · 3–5 hours

    Hang the wall panels

    Back wall first, then the side walls, so the side panels overlap the back panel and shed water into the pan rather than behind it. Dry-fit every panel before any adhesive goes on. Mark and cut the valve and shower arm holes from the finished face using a hole saw, cutting slightly oversized so the escutcheon covers the edge and the panel is not stressed. Apply adhesive as specified, press out from the centre, and support the top edge until it grabs.

  6. Stage 6 · 1–3 hours

    Fit the valve trim, fixtures and accessories

    Trim plate and handle, shower arm and head, glide bar and handheld, grab bars, fold-down seat, curtain rod or door. With our reinforced backing the grab bars go where the person needs them; hold each one in position and have the actual user try it before you drill. Sit on the seat. Reach the valve from the seat. Adjust before anything is permanent.

  7. Stage 7 · 1 hour

    Seal every joint

    Mask both sides of each joint, run a continuous bead of 100% silicone, tool it once with a wet finger or a proper tool, and pull the tape immediately while the silicone is wet. Seal the pan-to-wall joint, the vertical corners, around the drain flange per the instructions, and around every penetration. One continuous pass beats three touch-ups.

  8. Stage 8 · 24 hours

    Cure, then test

    Silicone needs roughly 24 hours before the shower is used. Resist. Then run the shower hot for ten minutes with the door or curtain closed and check every joint, the drain connection, and the ceiling below if there is one. Check again after a week of normal use. A leak found in week one is a bead of silicone; a leak found in year two is a floor.

The stage you cannot rush

Stage 4. A pan that is out of level by an eighth of an inch across five feet will pond water at one corner for the next thirty years, and no amount of sealant fixes it. It is twenty minutes of extra checking against a problem that cannot be corrected later without pulling the walls off.

The stage everyone skips

Stage 2. Once the old unit is out you have a rare, free look at the framing, the subfloor and the plumbing. Nobody will see it again for decades. Spending an hour there is the cheapest insurance available on the whole project.

Time

Where the two days actually go.

Typical professional hours for a straight swap into an existing footprint with no drain relocation. Our own working figures, not an industry survey — treat them as planning numbers rather than a quote. A DIY install generally runs one and a half to two times these hours, which is normal and not a reflection on anybody.

Hours by stage — professional, straight swap

Demolition Inspection Rough-in Set the pan Wall panels Fixtures & trim Sealing 2–5h 1h 2–6h 2–4h 3–5h 1–3h 1h 0h 2h 4h 6h

Solid bars show the low end, faded bars the high end. Green marks the two stages where care matters more than speed. Excludes the 24-hour silicone cure, which is waiting rather than working.

12h Low-end total for a professional straight swap, excluding cure time
25h High end, where demolition is heavy and the rough-in needs work
24h Silicone cure before the shower gets used. This one is not negotiable.
0 Bags of mortar required. Our pans are pre-leveled and self-sustaining.

Failure modes

Ten mistakes that generate callbacks.

Not theoretical. These are the things that come back to us as questions, complaints and warranty calls, roughly in order of how often we hear them.

The expensive five

  • Latex caulk instead of 100% silicone. The most common single cause of a leaking joint. It shrinks and lets go, usually within two years, usually at the pan-to-wall joint where it does the most damage.
  • Pan set out of level. Water ponds in the low corner forever. Unfixable without removing the walls. Check both directions and both diagonals, with weight in the pan.
  • Drain forced into alignment. If the pan has to be shifted or the drain flexed to meet the waste, something is wrong. Forcing it stresses the connection and it will weep later. Dry-fit and mark before you commit.
  • Side panels installed before the back panel. The overlap ends up shedding water behind the panel rather than into the pan. It looks fine for a year.
  • Ordering to the widest measurement. Walls are not parallel. Measure at three heights and order to the smallest number.

The annoying five

  • Valve hole cut too small. Cut slightly oversized. The escutcheon covers it, and a tight hole puts stress into the panel that shows up as a crack.
  • Grab bars placed to a drawing. Place them to the person. Have them stand in the shower and reach. This is exactly what the reinforced backing is for.
  • Over-tightened flange screws. Snug, not crushed. Over-driving dimples the flange and can craze the gelcoat.
  • Using the shower before the silicone cures. Twenty-four hours. Using it early is how a perfectly executed seal fails.
  • Not checking the delivery route. A single-piece unit that cannot turn the stairs is an expensive lesson. Measure the narrowest point on the whole path.

If you are mid-install and something is not matching the instructions, stop and call 1-888-779-2284. We would far rather spend ten minutes on the phone than have you improvise around a problem that has a proper answer.

Low thresholds

What recessing a pan actually involves.

The lower the threshold, the more your floor has to accommodate it. This is the part that turns a predictable job into a variable one, so it is worth understanding before you commit to a height.

Floor work by threshold height
ThresholdWhat the floor needsTypical labour impact
0.5″The pan generally has to be recessed into the floor framing so the entry sits nearly flush with the finished floor. On timber that means cutting the decking, headering off between joists and reinforcing.Adds roughly $400–$1,200 on a timber floor. On a concrete slab, substantially more, because the slab has to be cut.
0.75″–1″Sits on most subfloors with minimal preparation. Occasionally a small transition strip at the entry.Little to none beyond a standard install.
1.25″–2″Standard preparation. The pan sits on the subfloor as it comes.None.
Standard curbStandard preparation.None.

Recessing is not a DIY stage

Cutting a hole in a floor system and headering off between joists is structural work. It needs to be done correctly, it usually needs a permit, and on a slab it needs a saw most homeowners do not own. If the assessment above pointed you at a professional, this is usually why.

The honest alternative

If recessing is impractical, a 0.75″ threshold with a beveled edge delivers most of the same daily benefit in a private home. It is not an ADA roll-in threshold and we will not call it one, but it sits on the subfloor and needs no floor surgery. More detail on the barrier-free page.

Paperwork

Permits, inspections and when they apply.

Requirements vary by city and county, and the only authoritative answer comes from your local building department. That said, the pattern is consistent enough to plan around.

  • Usually no permit: a like-for-like replacement in the same footprint that does not move plumbing, alter framing or change the electrical.
  • Usually a permit: relocating a drain or supply lines, recessing a pan, cutting or altering framing, changing the footprint, or any work in a commercial building.
  • Always confirm: condominiums and HOAs frequently have their own rules on top of the municipal ones, particularly about work above another unit.
  • Rough-in inspection: where a permit is required, the inspector generally wants to see the plumbing before the walls close up. Do not hang panels until that is signed off.

On any commercial or code-driven project, confirm the layout with the building department before ordering. We will send spec sheets and submittals to support that conversation — there is more on the process on our commercial and ADA page.

Walk-in shower kit part way through installation with the pan set and wall panels being fitted

Labour

What installation costs on top of the kit.

Regional labour rates vary enormously, so treat these as bands rather than prices. They are the ranges we hear back from customers and installing contractors around the country.

Typical installed labour bands, United States
ScenarioTypical labourWhat drives it
Straight swap, same footprint, same drain$1,500–$3,500The baseline. Two days, one or two people, no surprises.
Tub-to-shower conversion$2,000–$4,500Heavier demolition and, very often, moving the drain from the tub end toward the centre.
Drain relocation added+$600–$1,800Access. Open joists from below is cheap; a finished ceiling underneath is not.
Recessing for a 0.5″ threshold+$400–$1,200 timberCutting and reinforcing the floor system. Substantially more on a slab.
Rot or mould remediation found at Stage 2+$300–$2,500Entirely dependent on extent. This is the one nobody can quote in advance.

Labour only, excluding the kit, freight and fixtures. Full component pricing and a no-email calculator live on the cost page.

Why buy from us

We would rather you install it right than buy it fast.

Call 1-888-779-2284 and you reach somebody who knows shower systems properly. They will ask about the drain, the floor and the doorway, because those three answers decide most of the specification and most of the install.

If you are installing it yourself, ask us anything. We will walk you through the drain connection, the panel sequence and the sealing, before you order and during the job. That is not an upsell; an install that goes well is worth more to us than one more accessory on the invoice.

We will also tell you when a job is beyond a reasonable DIY scope. Recessing a pan into a slab, moving a drain under a finished ceiling, or anything structural — we will say so plainly rather than sell you a kit and wish you luck.

BBB Accredited Business with an A+ rating, through our parent company Aging Safely Baths. Craftsman-built in the USA from reinforced fiberglass with a polyester gelcoat finish. Pre-leveled pans, slip-resistant floors, full reinforced wall backing, 30-year limited warranty.

Keep reading

Work out the rest of the spec.

Sizes & builder

Every footprint we build, plus a configurator that specs your kit.

Shower sizes

Barrier-free

Threshold heights from 0.5″ to 2″, and what each asks of your floor.

Barrier-free

Tub conversion

Replacing a bathtub, and the drain position problem.

Tub to shower

What it costs

Component pricing and a no-email calculator.

Pricing

Installation questions

What people ask before they start.

Not here? Call 1-888-779-2284. Describe the drain and the floor, and we will do the rest.

How long does it take to install a walk-in shower kit?

A straight swap into an existing footprint with no drain relocation is a two-day job for a professional: roughly 12 to 25 working hours depending on how heavy the demolition is and what the rough-in needs. A careful DIYer should plan on one and a half to two times that, so a long weekend. On top of the working hours, allow 24 hours for the silicone to cure before anyone uses the shower.

Can I install a shower kit myself?

Many people do. The demolition, setting the pan, hanging the wall panels, fitting the trim and sealing are all within reach of a competent DIYer who owns a 4 foot level and reads the instructions. Where most people should stop is relocating a drain, altering framing, or recessing a pan into the floor to achieve a half inch threshold. Those are licensed trade jobs in most jurisdictions and structural work in all of them.

Do your shower pans need a mortar bed?

No. Our pans arrive pre-leveled and self-sustaining, so no mud setting is required at any threshold height. That removes roughly a day of labour and eliminates the single most common cause of a shower pan failing years later. The trade-off is that the subfloor underneath has to be flat, sound and dry, because there is no mortar to make up the difference.

What is the minimum size a shower can legally be?

It depends which model plumbing code your jurisdiction adopted. Under the International Plumbing Code and the IRC, a shower compartment must have at least 900 square inches of interior area and a least dimension of 30 inches, with an exception allowing 25 inches if the compartment has at least 1,300 square inches. Under the Uniform Plumbing Code it must have at least 1,024 square inches and be able to encompass a 30 inch circle, with no equivalent exception. Both measure the finished interior at threshold height, not the outside of the kit.

What size drain does a shower need?

A shower drain is 2 inches minimum, properly trapped and vented. If you are converting a bathtub, check the existing line: tub waste is sometimes smaller and always sits at one end rather than the centre, which is the most common surprise in a tub-to-shower conversion.

What caulk should I use on a shower kit?

100% silicone, everywhere water can reach. Not latex, not siliconised acrylic, not a general purpose tub-and-tile caulk unless the tube specifically says 100% silicone. Latex and acrylic caulks shrink, lose adhesion on gelcoat and support mould growth, and they are behind a large share of joints that start leaking within two years. Colour-match it to the pan and run one continuous bead rather than three touch-ups.

How level does the shower pan need to be?

Level in both directions, checked with a 4 foot level along the front edge, along the back edge and across both diagonals, and checked again with weight in the pan. An eighth of an inch out across five feet will pond water in one corner for the life of the shower, and it cannot be corrected afterwards without removing the wall panels. This is the stage to slow down on.

Will a shower kit fit through my bathroom door?

Multi-piece units are designed to. They break down into sections that pass a standard 32 inch door, go up stairways and around corners, and a split backwall clears openings that a full sheet will not. Single-piece units arrive as one moulded piece and need a clear straight path, so they generally suit new construction or a gut renovation. Measure the narrowest point on the whole route from the front door to the bathroom and give us that number.

How do I measure my shower opening?

Measure the width at the floor, at waist height and at the ceiling, then use the smallest of the three. Do the same for depth. Walls are rarely parallel, particularly in older houses, and a kit ordered to the widest measurement will not go in. Also note where the drain sits and how far it is from each wall, and check whether the floor is timber or concrete slab.

Do I need a permit to install a walk-in shower?

A like-for-like replacement in the same footprint that does not move plumbing or alter framing often needs no permit. Relocating a drain, recessing a pan, cutting framing or changing the footprint usually does, and any work in a commercial building almost certainly does. Requirements vary by city and county, and condominiums and HOAs frequently add their own rules. Where a permit is required, the inspector generally wants to see the rough-in before the walls close up, so do not hang panels until that is signed off.

Which wall panel goes on first?

The back wall, then the side walls, so that the side panels overlap the back panel. Done the other way round, the overlap sheds water behind the panel instead of into the pan, and it will look completely fine for about a year. Dry-fit every panel before any adhesive goes on.

How long before I can use the shower?

Allow 24 hours for the silicone to cure. Then run the shower hot for ten minutes with the curtain or door closed and check every joint, the drain connection and the ceiling below if there is one. Check again after a week of normal use. Using the shower early is a common way to make a perfectly executed seal fail.

What does it cost to have a shower kit installed?

Labour bands vary a lot by region. A straight swap into the same footprint with the same drain typically runs $1,500 to $3,500 in labour. A tub-to-shower conversion typically runs $2,000 to $4,500 because demolition is heavier and the drain often has to move. Relocating a drain adds roughly $600 to $1,800 depending on access, and recessing a pan for a half inch threshold adds roughly $400 to $1,200 on a timber floor and considerably more on a slab. Those figures exclude the kit, freight and fixtures.

Does a half inch threshold have to be recessed into the floor?

Usually, yes. To bring the top of the threshold within half an inch of the finished floor, the pan generally has to sit down into the floor framing. On timber that means cutting the decking, headering off between joists and reinforcing. On a concrete slab it means cutting the slab. If recessing is impractical, a 0.75 inch threshold with a beveled edge delivers most of the same daily benefit in a private home, though it is not an ADA roll-in threshold.

What tools do I need to install a shower kit?

A 4 foot level is the important one, and a torpedo level is not a substitute. Beyond that: tape measure, chalk line, framing square, stud finder, drill/driver with hole saws for the valve and shower arm, jigsaw or oscillating multi-tool for panel cut-outs, a decent caulk gun, and pry bar, reciprocating saw and utility knife for demolition. Plus a shop vacuum, dust sheets, gloves and eye and ear protection.

What should I check once the old shower is out?

This is the stage most people skip and the one that decides whether the job stays on budget. Look for rot in the sill plate and the bottom of the studs, mould behind the old surround, soft subfloor near the drain, framing that is out of plumb, and any springy joists. Fix all of it before anything new goes in. You will not get another free look at the framing for decades.

Do I need blocking in the walls for grab bars?

Not with our panels. Full reinforced backing runs throughout the wall system, so grab bars mount at the height and position that suits the person rather than wherever a stud lands, and they can be repositioned later. If you are fitting a different panel system, add solid blocking between studs anywhere a grab bar or seat will land, because retrofitting it means opening the wall again.

What water temperature should the valve be set to?

Under the ADA, an accessible shower spray unit must deliver water at 120 degrees Fahrenheit maximum, which in practice means a thermostatic or pressure-balancing valve rather than a plain mixer. Even outside a code-driven project it is worth doing, because scald protection matters most for exactly the people a walk-in shower is usually bought for. It is cheap at rough-in and expensive to retrofit.

Get your quote

Tell us the room. We will tell you what fits.

Send your measurements and we will come back with the sizes that work, the threshold height we would recommend, and a price. If you want it installed, say so and we will quote that too.

Not sure how to measure? Do not worry about being precise on the first pass. Give us rough numbers and a photo, and we will tell you exactly what to measure next.

Rather just talk?

1-888-779-2284

A real person answers, and they know the product. No call centre, no script.

We use your details to answer your enquiry and nothing else. No lists, no resale, no follow-up you did not ask for.

Call before you demo.

Tell us the drain position and what the floor is made of, and we will tell you what fits, what it costs and whether you can install it yourself.

1-888-779-2284